Milestone for Swarfix® WCT 958: Second Pilot Operation successfully completed for Equinor.

Our most compact swarf collection tool has once again proven its ability to isolate and store and secure swarf during milling operations. A third pilot is already scheduled.

Milestone for Swarfix® WCT 958: Second Pilot Operation successfully completed for Equinor.
Swarfix is proud to announce the successful completion of the second field pilot of our most compact downhole swarf collection tool – the Swarfix® WCT 958 – carried out for Equinor.

Operation Summary:
– All Swarf collected during whipstock milling in 7” 29# liner section.
– Swarfix® WCT 958 positioned 565 m above the mill (@ 75° deviation) in 9 5/8” casing
Swarf barriers above confirmed zero swarf bypass:
• No swarf on string magnets
• No swarf on flowline magnets
• Blowout preventer (BOP) not exposed to sward
• Manual swarf handling by personnel eliminated

This confirms again:
Swarfix® technology effectively isolates and contains all swarf during milling operations.
What’s next?
A third pilot operation is already scheduled within the next 2–3 weeks.
Field photos from the offshore operation are available in the image gallery below. Feel free to share this update with colleagues in drilling and well operations.

Energivegen 20
4056 Tananger
Norway

post@swarfix.com